Use Cases
These real-world scenarios show how teams use Bulk Link & Archive for Jira together to keep projects clean and relationships meaningful.
Closing out a completed project
Situation: A project is delivered. You want to mark all completed issues as closed under the main epic, then archive them so they stop cluttering boards.
Open the project epic issue.
Click ... > Link Issues in Bulk.
Select link type is closed by (or your organisation's equivalent).
Use JQL mode:
project = MYPROJECT AND status = Donewith a max of 1000.Confirm and run the link operation.
Open the issue navigator, click Apps > Archive Issues in Bulk.
Use the same JQL query to target the same set of Done issues.
Confirm and archive.
Result: All completed issues are linked to the epic and removed from active boards and backlogs.
Sprint cleanup after a retrospective
Situation: Sprint has ended. All resolved issues should be archived so the backlog only shows active work.
Go to All work in your project.
Click Apps > Archive Issues in Bulk.
Use JQL mode:
sprint = "Sprint 12" AND status in (Done, Resolved, Closed)Preview the results, confirm, and archive.
Result: The board clears automatically. Archived issues remain accessible via direct URL for historical reference.
Restructuring links after a re-prioritisation
Situation: A scope change means several "blocks" relationships are no longer accurate -- they should be "relates to" instead.
Open the issue at the centre of the dependency change.
Click ... > Change Link Type in Bulk.
Set Change from to blocks.
Set Change to to relates to.
Choose All matching to update all "blocks" links on this issue, or Specific keys to change only a subset.
Review the confirmation screen and confirm.
Result: All selected links are reclassified in one step, keeping your dependency graph accurate without editing each issue manually.
Adding sprint review meeting notes across a set of issues
Situation: After a sprint review, you want to attach the meeting recording URL to every issue that was demonstrated.
Open any issue from that sprint.
Click ... > Add Web Link in Bulk.
Enter the meeting recording URL (must start with
https://).Enter a title, for example: Sprint 12 Review Recording.
Use JQL mode:
sprint = "Sprint 12" AND status = Doneto target reviewed issues.Preview, confirm, and run.
Result: Every reviewed issue now links directly to the recording. Team members reviewing past work can find context in one click.
Removing stale links before archiving
Situation: Before archiving a set of completed issues, you want to clean up outdated "is blocked by" links that were never resolved.
Open the issue with stale links.
Click ... > Unlink Issues in Bulk.
Select the is blocked by link type from the dropdown.
The dialog shows all issues currently linked as "is blocked by".
Enter the keys you want to unlink (or paste all of them).
Review the confirmation screen and confirm.
Result: Stale blocking relationships are removed, leaving a clean issue history before the work is archived.